Send inquiry
Model Number: TOP-151022-19-R
Brand Name: TOPWELL
Key Specifications/Special Features:
Packing/shipping:For mold: after assemble and clean the mold, we paint anti-rust fog or grease on mold, then cover it with thin film and place it into a stable wooden boxFor plastic product: first thing is to wrap each part up with semi-transparent thin foam and put it into plastic bag, the second step is place them into cartons with thin sponge plates to prevent scratchesDelivery lead-time: fast lead time about 20 days, 3 shifts, on time deliveryOur services: specialize in making plastic injection mould, die casting mould, stamping mould, electronic product, automotive product, home appliance and medical products
Advantages:
- Topwell was incorporated in 1996, has evolved to be one of the leading customer injection molders of our region
- Can provide one-stop service to satisfy our customer, including make DFM report, mold flow analysis, part and mold design, high-quality mold machining, good parts, silkscreen, spraying, sandblasting and good after-sale service, whatever our customer need, we'll try our best to reach it
- Have enough capability of injection molding machine to meet the requirements if the customer needs mass production
| Mold name | Injection plastic product | |
| Mould Shaping | Plastic injection mould | |
| De-mould Type | Automatic eject/with robot hand | |
| Mould base | LKM, Hasco and DME | |
| Mould material | NAK80, S136, 2316, 2738, H13, 5CrNiMo, 718H, P20, 40Cr, 60#, 45# and more | |
| Mould Cavity | Single or multi, as your requirement | |
| Sprue Gate | YUDO runner,Hot runner, Cold runner, Pin-point gate, Submarine gate, and more | |
| Design software | UG, Pro/E, CAD, CAXA, and more | |
| Plastic material | PP, PC, PS, PA6,POM,PE, PU, PVC, ABS, PMMA, and more | |
| Mould life | 300000 - 1,000,000 shots | |
| Delivery time | 15-30 days | |
| Payment Terms | T/T | |
| Packaging | Wooden Cases | |
| Transportation | By Sea or by air, as your requirement | |
| Export Country | Worldwide | |
| Specification | As your requirement | |
| OEM order | welcome |
Shipping Information:
- FOB Port: Shenzhen
- Lead Time: 30 - 40 days
Main Export Markets:
- Australasia
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe
